Balance correction of blower impeller

The client consulted on a foreign-made blower that had not been installed for some time and was not operating reliably due to high vibrations. The request was to take the equipment back to the plant for periodic maintenance, to correct the balance and to reverse engineer the shaft. As the maintenance period was short, the work was carried out in cooperation with our affiliate Kurashiki Boring Machine Works.

Accepting

羽根引き取り
Went out to pick up the blades and shafts for two blowers
持ち帰った後清掃
Clean after taking home and remove any adhering material

Due to the surrounding environment and materials, the parts other than the fitting are showing signs of severe corrosion. Due to the short construction period, we limited ourselves to the repair of the targeted areas and drew up repair instructions and drawings to enable fabrication.

軸も2本分持ち帰り
We also take two axes home with us
軸の嵌め合い部を補修すします
The shaft mating parts were also repaired in the shortest possible time and measured for the production drawings

Dynamic balance correction and repair

The dynamic balance of the blades was corrected to meet the specified standards, and the shaft mating parts were also repaired to suppress vibration from both the rotor and the shaft.

動バランス修正中
Dynamic balance being corrected
軸の嵌め合い部の補修も完了
Repairs to shaft mating parts have also been completed
«